Cost Of A Medium Big Station
Subj: Fw: [TowerTalk] Cost of a medium big station?
From: K0FF - [email protected]
To: vhf@w6yx - [email protected]
Tower Talk (mail list) - [email protected]
Sent: Sunday, May 21, 2000 1:41 PM
Subject: [TowerTalk] Cost of a medium big station?
Here is a Rundown of the $$ for a Medium Big Midwest
Station.
7 Towers and 7 Beverages with a VHF/UHF Emphasis
* Denoted homebrew ** Denotes items purchased
used
Antennas |
Towers |
Rotors |
Hygain 5 el 20
500 Hygain 5 el 15 500 Hygain 5 el 10 450 Mosley Pro 57 600 CC 6M Boomers (4) 1476 CC 2M Boomers(8) 1760 CC 230WB 250** M2 2M-17el (5) 999 M2 6M 7 el 290 M2 6M 11 el 530 M2 432 13WL 230 M2 222 7WL 300 M2 1296 100 R7000 380 R5 100* HF2V 239 Create LP 300 s.s Discone (VHF) 50 Hustler discone 50 Diamond 2/440 rptr ant 240 Mosley el 40 900**
For the trailer tower:
|
100' SSV 8-1/2' base
2000** 10x10 air-conditioned transmitter building free professional delivery installation of above incl... under ground electricity and 39 yds concrete, and removing the old 185' microwave tower .............. 16,000
89' US Tower, work platform, Triex 56' crankup 400** Triex 72' Motorized crankup 1000** HDX 56 50** Heights 48 100** Wilson 40' tubular 200**
33' Triex trailer tower
20' 55G w/ (2) 3" bearings, |
HDR300
300**
Tailtwister(2) 1000 Ham4 (2) 800 M2 2800 (2) 2860 M2 M3000 (2) 2000 hd73 (2) 300 CDE 45 (2) 100**
Pelco AZ EL 1500
|
Antennas Total ..............10,644 | Total for Towers ........................39,150 | Total for Rotors....8,860 |
Rigs |
AMPS |
FT1000D (HF sta.)
3000** IC756 (6M sta.) 2000 FT 847 (2M EME) 1600 FT736 (222+1296 sta.) 2500 FMs + HTs 1000 MFJ 9420 150 ATV gear 600 TUBE RIGS (nostalgia sta): ...2000**?? (75S3C / xtal pack 32S3 / DX eng Dentron 160 xvtr Viking II Mosley CM1 Utica 650) |
HF (Henry)
6000 6M (Henry) 3000 2M (Henry) 3000 SB221 400** LK1000 200** Bricks for vhf+UHF 1500 |
Rigs Total ................................... 12,850 |
AMPs Total ............................. 14,100 |
Accessories |
Coax, Control Wire |
Bird W/M (6)
600 12 slugs 600 Drake 7000 rtty 300** HP Pentium II 2000 HP Laser printer 1400 Atomic clock 200 SSB 2m preamps (2) 440 Polypahser panel 500 Ant analyzer, grid dippers, sig gens, voltmeters, other test equip 1000 Auto notch filter 150 Voice keyers (2) 300 Tuners 350 |
350' 1-5/8 run from op. position to TX shack at 100' tower 3000 225' 1-1/4 run from op pos to 89' tower (new w/ new connectors) 1200 6 100' runs 7/8" 600 6 100' runs 1/2" 300 1000' RG389 500 3000' 75Ohm Triax 2850 3000' RG 213 300 LMR 400 phasing lines 500 Power splitters 500 5KW relay boxes (3) 300* Bev hub box 100* innumerable coaxial fittings + adapters, ground rods, ground strapping.. 1000's ft multiconductor control wire. 10,000's ft 18ga . wire for radials + Beverages. ?? |
Accessories Total ......................... 8,050 | Total Coax etc.......................10,000+ |
Project Total.......................................................................100,000+ |
# price does not reflect the cost of the 1000' of riverbluff
top for siting, road cutting, trenching for electric, tree removal,
etc.
This fellow wishes to remain anonymous.
He's already over budget, his wife may see this.
She thinks he's finished already.
de KoFF
NNNN
Reply #1 | Reply #2 | Reply #3 | Reply #4 | Reply #5 |
This Page By Norm - AI2C of
the
LARG WEB Masters Committee
Back
To
K4LRG's Main Page
|