Balloon Flight Mission
Control Procedures
Flight 2002A - Sky-Eye Launch
- 20 July 2002
de W4AU - John Unger - Thursday,
July 11, 2002 4:00 PM
1. Establish comms with Launch, Tracking
and Recovery Teams, synchronize watches, and request time to ops ready status
for each Team
1.1. Comms freqs: 147.480 simplex, ~7.010 CW,
7.285, and below LSB; options: 147.060 (Frederick repeater), 147.255 (Martinsburg
repeater)
2. Schedule launch time (approx. 0900 EDST) and relay to all Teams; synchronize
watches
3. Launch Team is ready to fill the balloon
3.1. Verify that Tracking and Recovery Teams
are ready for launch
4. When all teams are ready, clear the Launch Team to fill the balloon.
5. Launch Team is ready to release the balloon
5.1. Verify all teams ready to copy balloon
signal
6. Give permission for Launch Team release the balloon; record launch time.
7. Stand by for Acquisition of Signal (AOS)
8. Record AOS time and relay to all tracking teams.
8.1. Schedule tracking observations at 10-minute
intervals from AOS.
8.2. Initial tracking observation as soon as
all tracking stations have AOS.
9. Take bearings from Tracking Teams (repeat reports for others to copy)
and plot fixes.
10. Monitor flight telemetry on downlink (145.650 MHz).
10.1 Plot pressure (altitude) every transmission
if possible and outside temperature.
11. Periodically report flight status to all teams.
12. Report max altitude (burst height) and descent phase to all teams.
13. Estimate descent time and calculate estimated touch down time.
14. Estimate landing area and relay to all teams.
15. Continue to plot fixes.
16. When downlink indicates touchdown:
16.1. Call for final bearings,
16.2. Plot final fix
16.3. Relay final fix to all trackers
16.4. Assign one tracking station (or mission
control) to monitor balloon package signal
16.4.1. Terminate tracking ops and stand by
until Tracking Teams are packed and ready to travel.
17. When tracking Teams are ready to travel terminate mission control ops
and clear all teams to head for landing area.
MISSION CONTROL - EQUIPMENT LIST
Medium scale (~1:250,000) map(s) of region mounted on rigid board with compass
rose at Mission Control location - W4AU
Protractor (large, circular; 0-360 degrees) -- W4AU
Large triangle (for drawing N - S lines through Tracking Team locations --
W4AU
Table of pressure vs. altitude -- WB3AKD
Made-up table for entering pressure, voltage, and temperature data from downlink
-- WB3AKD
Notebook computer -- W4AU
Tape recorder -- W4AU
DF gear -- W4AU
Compass -- W4AU
2-meter rig - Comms - WB3AKD
2-meter rig - tracking - WB3AKD
HF rig - Comms - WB3AKD
MISSION CONTROL - PERSONNEL DUTIES
Track balloon as part of Tracking Team
Record and plot data from Tracking Teams
Communicate with Launch, Tracking, and Recovery Teams
Record and plot data from balloon telemetry
Personnel:
W4AU - record and plot tracking
data
- communicate with
other teams
K4LJH - record and plot balloon telemetry
data
- track balloon
signal
NNNN |